PALMETTO COAST INDUSTRIAL PARK
MYRTLE BEACH, SOUTH Carolina
THE MYRTLE BEACH
MARKET'S FIRST CLASS A INDUSTRIAL PARK
Water Tower Road
Myrtle Beach, SC
UP TO 665,854 SF
Building 1 | Delivered Q1 2024
Building 4 | Delivered Q1 2024
Building 2 | Projected Delivery Q1 2025
Edgewater Ventures is pleased to present Palmetto Coast Industrial Park (PCIP) — the Myrtle Beach market’s first Class A industrial park. Totaling 69 acres and 665,854 SF across four (4) buildings, the project will provide users with a best-in-class park setting capable of accommodating users from 25,000 SF up to 217,350 SF+. Positioned along Water Tower Road with uninterrupted access to SC HWY 31, SC HWY 22, and US HWY 17, the park provides outstanding connectivity to the entire Myrtle Beach MSA in addition to Wilmington, NC, and Charleston, SC.
Building 1 recently delivered in Q1 2024 and is a 165,000 SF rear-load facility featuring attractive tilt-wall construction, a 32' minimum clear height, an ESFR sprinkler system, 50' x 54' column spacing, up to 44 dock-high loading positions, and LED lighting. Building 2 is currently slated to deliver in Q1 2025.